We use proprietary and third party's cookies to improve your experience and our services, identifying your Internet Browsing preferences on our website; develop analytic activities and display advertising based on your preferences. If you keep browsing, you accept its use. You can get more information on our Cookie Policy
Cookies Policy
Coordination and support procedures - FIWARE Forge Wiki

Coordination and support procedures

From FIWARE Forge Wiki

Jump to: navigation, search

Contents

Coordination Approach

FIWARE Lab activities are managed by weekly scrum meetings and monthly Agile sprints. Every Tuesday at 15:00, all Nodes Administrators report their status and discuss different topics relating to the activities carried out within the Lab. The main topics covered within the meeting are:

  • Status of the node
Each Node Administrator, provides a snapshot of the current status of its node. He/She provides information about the presence within the Infographic page (http://infographic.lab.fiware.org), about the Sanity Checks status (http://status.lab.fiware.org), as well as useful updates during specific activities like hardware maintenance, users migration or OpenStack upgrade version.
  • Issues occurred during the previous week
Each Node Administrator, discusses issues encountered during the past week. This is a crucial point in order to identify and solve possible weaknesses or bugs within the FIWARE Lab architecture (e.g. common connectivity errors toward the centralized keystone) as well as possible weakness in the FIWARE Lab documentation.
  • Instructions from the FIWARE Lab Task Force or Technical Steering Committee
This task is to inform all Nodes Administrators about decisions taken by the FIWARE Lab Task Force or by the Technical Steering Committee and to design a roadmap of the future activities.
  • Help Desk pending requests
All Nodes Administrators are asked to verify all pending (not closed) Help Desk requests, and it is discussed how to resolve them as soon as possible in order to meet agreed SLAs.
  • Share suggestions
This task is to share suggestions among all Node Administrators and FIWARE Lab technical experts. It is an important aspect of the meeting because it allows those who have found a solution or workaround for a specific problem to share that experience among the community to facilitate the expansion and stability of FIWARE Lab.
  • Topics of the day
This is an open window within the meeting to discuss about topics (even off-topics) not covered during a standard meeting.
  • Agile Sprint meeting
Twice a month, in addition to the topics covered above, a Planning Sprint and a Closing Sprint activities is inserted within the meeting. All node administrators are asked to create a “work-item” for every single activity they are going to carry out so that to have a trace of the whole FIWARE Lab activities and effort spent.

Beside all points above, a specific mailing list (fiware-lab-federation-nodes@lists.fiware.org) is constantly used from Node Administrators and FIWARE Lab experts to exchange each other doubts, information, tips and any kind of communication useful to the growth and stability of FIWARE Lab.

Community Account Requests

A Community User is allowed to experiment with FIWARE technology for a period of more than 9 months. Typical examples are SMEs/start-ups under the FIWARE Accelerator Programme.

Trial Users can always apply to for upgrading their accounts to become Community Users. This is granted to everybody if it is understood that the application they aim to developing, is considered a relevant reference example for the development of the FIWARE Community.

In order to apply to become a Community User it is necessary to compile an application form accessible through the main page of the FIWARE Lab portal (https://account.lab.fiware.org) – click the Request Community Account Upgrade - button.

FIWARE Lab request community account upgrade

Figure 6.1: FIWARE Lab request community account upgrade.

This will open a window in which information about application is requested from the user, this information will be used to understand exactly what is the planned use of the resources, why they are required and in which FIWARE Lab node you plan to use those resources.

FIWARE Lab community account request

Figure 6.2: FIWARE Lab community account request.

It will create a ticket inside the FIWARE Lab Upgrade Account in Jira to be response by the L1 Support team and assigned accordingly to the corresponding FIWARE Lab administrator node in order to resolve it.

FIWARE Lab Upgrade Account (FLUA) Jira project

Figure 6.3: FIWARE Lab Upgrade Account (FLUA) Jira project.

From here, the FIWARE Lab node administrators will take those tickets and apply the corresponding activities described in section Account Management to provide the corresponding resources to the user.

Help Desk Support

The Help Desk activities are daily part of FIWARE Lab operations. The Help Desk is the support that FIWARE Lab experts, Nodes Administrators and GEs Owners, give to external and internal users. The Help Desk activities are structured in 2 main Level of support in order to guarantee that agreed SLAs are achieved.

The first level of support is comprised of a team which is in charge of managing all FIWARE Lab incoming tickets. This team is also responsible for categorizing all incoming tickets in order to guarantee that Backlog statistics (http://backlog.fiware.org/helpdesk/main) are always properly updated. If is not possible for a member of the first level support to solve a problem (e.g. a specific Node failure), he/she will assign that ticket to a second level of support consisting of Node Administrators and GEs Owners. The Level 2 Help Desk team is in charge of providing specific high-level support for the corresponding FIWARE Lab Node or FIWARE Generic Enabler.

In the following, we describe in more details the procedures for Level 1 support.

The Level 1 Help Desk team is the initial contact point for all incoming tickets, it provides support for general issues that can be easily solved by pointing to the FAQ, Stack Overflow, groups or other documentation. Moreover, its responsibility is to filter, categorise and forward to Level 2 support (Node Owners or GE Owners) all those tickets that it is not able to answer. It is also responsible for managing Community Account requests.

The Level 1 Help Desk team is organized in 8x5 (Mon to Fri) scheduled shifts from 08:00 to 17:00. The team is composed by people from Engineering, FBK, FIWARE Foundation, Martel that are on duty on a respective week according to the calendar available at: https://docs.google.com/spreadsheets/d/1X9iLY9Znd3Rh-GM4qffGEHRNKqKcHZqdm-dP0rq8OVo/edit#gid=1383004526. Regarding INFOTEC and ITSM they are in charge of the management of the FIWARE Lab Mexico node, providing support to the corresponding Level 1 Help Desk team.

At the end of each day, there should be no tickets remaining in status “unassigned” within the FIWARE Lab Help Desk queue: http://backlog.fiware.org/lab/helpdesk.

Level1 Support Requests Management

The activity that each member of the L1 Support Team should be assigned the corresponding tickets to the proper person, assigning the corresponding Component and for statistical reasons assign the corresponding HD-Chapter, HD-Enabler and HD-Node. They are Jira issues attributes that need to be assigned manually when a new ticket is received. Usually, it is made by the FIWARE Scrum Master together with the process to assign the ticket to the corresponding owner in order to be resolved.

HD-Chapter, HD-Enabler and HD-Node attributes in issues

Figure 6.4: HD-Chapter, HD-Enabler and HD-Node attributes in issues.

For the assignee of the JIRA ticket, we have to differentiate between Generic Enablers owners and FIWARE Lab administrators’ nodes. For the first one, the list of owners can be obtained from the following table:

https://docs.google.com/spreadsheets/d/1X9iLY9Znd3Rh-GM4qffGEHRNKqKcHZqdm-dP0rq8OVo/edit#gid=694707434

It is a working document of FIWARE and it is available for the FIWARE Lab administrators. If a FIWARE Lab node administrators want to get access to it, they can request access to the owner of the file (fernando dot lopez at fiware dot org). In case of the FIWARE Lab administrator owners this information should be found in the following table:

https://docs.google.com/spreadsheets/d/1X9iLY9Znd3Rh-GM4qffGEHRNKqKcHZqdm-dP0rq8OVo/edit#gid=744561338

Regarding the components, usually they are automatically selected by the different tools that are behind JIRA, but in case that we found a JIRA ticket without the component the available values are the following:

Table 6.1: List of components in Help-Desk Jira project.

Components Description
FIWARE-COLLABORATION-REQ Issues related to the request associated to some type of collaboration with FIWARE in terms of participation in some events or in terms of improvement some FIWARE GEri
FIWARE-FEEDBACK General issues related to feedback recover from the users.
FIWARE-GENERAL-HELP Issues in general not classified in the other components.
FIWARE-LAB-HELP Issues related to some of the FIWARE Lab nodes
FIWARE-MUNDUS-REQ Issues regarding the activities of FIWARE associated to the extension of FIWARE beyond Europe (FI-GLOBAL project).
FIWARE-OPEN-DATA-REQ (Deprecated) Issues related to the management of Open Data inside CKAN tool or related to the possibility to contribute with Open Data inside FIWARE ecosystem.
FIWARE-OPS-HELP Issues related to the use of the different FIWARE Ops tools.
FIWARE-SMART-CITIES-REQ (Deprecated) Issues related to the collaboration in the SmartCities
FIWARE-SPEAKERS-REQ Issues related to the request to get some FIWARE expert to provide some entation or speech in some events or just in some Summer School or so on.
FIWARE-TECH-HELP Issues related to some of the FIWARE GEri.
FIWARE-TRAINING-REQ (Deprecated) Issues related to the request of training for some of the accelerator program. Currently, it is not needed due to there is no request for training from accelerator programs.

In case of HD-Chapter and HD-Enabler, they make reference to the corresponding Chapter and Enabler that have to be assigned the corresponding JIRA ticket, how it was described previously (see Figure 6.4: HD-Chapter, HD-Enabler and HD-Node attributes in issues.). It is something that have to be selected once we edit the corresponding JIRA issue.

Jira Help Desk issue

Figure 6.5: Jira Help Desk issue.

Last but not least, HD-Node makes reference to the corresponding FIWARE Lab node in which this issue should be resolved. Usually, the issues are related to FIWARE GEis or FIWARE Lab nodes. The first one is associated to the email fiware-tech-help@lists.fiware.org and the second is associated to fiware-lab-help@lists.fiware.org. This means:

  • FIWARE GEis have associated the attribute of the HD-Enabler in order to identity which one is it and the HD-Chapter to know on which FIWARE Chapter is included this enabler.
  • FIWARE Lab nodes has associated the attribute HD-Node, in order to know to which FIWARE Lab node is assigned this issue or Jira ticket.
  • Due to these tickets come from different source it is needed to complete only HD-Chapter and HD-Enabler in case of tickets associated to FIWARE GEis or HD-Node is case of tickets associated to FIWARE Lab nodes.

How it was mentioned before, the reason of it, is just to allow further analytical analysis of the tickets that we receive in the different channels.

Community Account Requests Management

The Level 1 team is also responsible for the process of approval of the Community Account requests.

Each time a FIWARE Lab user asks for a Community Account, a “FLUA” ticket is generated and the Level 1 team is responsible for verifying the eligibility of users and approve the requests of the user as trusted.

This is done by examining the scope of the account request, e.g. the project for which it was requested and how it adopts FIWARE technologies. To be eligible, a request should: i) make relevant use of key FIWARE technologies (i.e. not just using the Lab as mean to host other technologies); ii) have an experimentation or educational purpose (i.e. commercial services cannot be hosted on FIWARE Lab).

Only if an account is eligible the user is upgraded to Community and the resources assigned accordingly.

Based on the preferences of the user and resource available, the Level 1 team assigns the approved accounts to a Node. The Level 1 team will keep open the initial ticket until the node completes the assignment and eventually follows up with the assigned node (and the user) to ensure that the procedure completes correctly.